CONSTRUCTION PHASE ENVIRONMENTAL SUPPORT

EnviroCentre’s services range from feasibility stage through to post development monitoring and decommissioning support. We recognise that environmental support during construction phase is becoming increasingly important to ensure that projects achieve their environmental goals and meet the requirements of their consents.

Our range of expertise include:

Construction Environmental Management Plans

A Construction Environmental Management Plan (CEMP) will outline how construction avoids, minimises or mitigates environmental impacts, and sets out roles and responsibilities to ensure compliance with environmental legislation and the implementation of necessary mitigation measures.
EnviroCentre are highly experienced in the production of CEMPs for developments ranging in scale from small rural/urban schemes up to major infrastructure projects. We have also prepared CEMPs for both brownfield sites, and sites which are located within sensitive and protected environments.
Our experienced team has a wide range of skills required to obtain, review and  extract information from the numerous supporting documents preprepared by diverse disciplines during site assessment process. EnviroCentre will identify and manage potential conflicting site constraints, that require mitigations are put in place prior to the commencement of works. EnviroCentre have the experience to enables legal compliance while minimising costs and/or timescales. 
The CEMP should cover all potential effects, such as ecological management, water management, dust, noise & vibration, construction traffic management, waste management and pollution prevention procedures. A CEMP is therefore essential in helping plan construction projects and mitigate potential environmental impacts.
Construction Phase Environmental Support
Construction Phase Environmental Support

CEMP Preparation & Support

EnviroCentre can prepare the CEMP and identify supporting mitigation measures, or we can assist with the preparation of supporting plans, typically conditioned by Planning Authorities and/or Regulators including:
  • Biodiversity Management Plans
  • Surface Water Management Plans
  • Site Waste Management Plans
  • Noise Management Plans
  • Dust Management Plans

Ecological and Environmental Clerk of Works (ECoW)

Our ECoW team have significant experience across a range of project types from ground investigation stage through to long term construction and post construction phase monitoring. We have worked on large scale residential, road and energy projects each with their own specific environmental sensitivities and requirements.
Environmental Monitoring
We can provide a range of services with respect to environmental monitoring including:
  • Surface water sampling (including installation of long term monitoring equipment)
  • Groundwater sampling
  • Dust and air monitoring
  • Noise monitoring
We will work closely with the client and carry out consultation with the regulator to provide an appropriately scoped and efficient monitoring plan. 

Contact Us

Please call your local office to discuss your requirements with a member of the Geo-Environmental Team, or alternatively, email us at info@envirocentre.co.uk